A structured path from planning to your first swim

Every pool project follows the same five phases. The question is whether you navigate them alone — or with an experienced advisor by your side.

Phase 1

Discovery & Planning

3–6 months before construction · 2–4 weeks

What you're deciding

Before you talk to a single builder, you need clarity on budget, pool type, and whether your yard can even support a pool. Most homeowners skip this phase — and regret it.

  • Can I afford this? What's a realistic budget including hidden costs?
  • What type of pool (gunite, fiberglass, vinyl) fits my needs?
  • Is my yard suitable? (slope, soil, drainage, setbacks, utilities)
  • What permits and HOA approvals do I need?
  • What features matter vs. what's a waste of money?
  • What should I future-proof for? (gas lines, electrical, automation)

What you'll receive

  • Personalized needs assessment
  • Budget reality worksheet
  • Pool type comparison guide
  • Yard feasibility checklist
  • Permit & HOA requirements summary
  • Feature priority matrix

Exit Criteria

What must be true before moving to Phase 2:

  • Clear budget range established
  • Preferred pool type selected
  • Site feasibility confirmed
  • Ready to engage builders
Phase 2

Builder Selection & Bid Review

2–4 months before construction · 3–6 weeks

What you're deciding

Choosing the right builder is the most consequential decision in your pool project. You need to know which builders to invite, how to evaluate them, and what red flags to watch for in contracts.

  • Which builders should I invite to bid?
  • How do I evaluate whether a builder is legitimate and competent?
  • Are these bids fair, complete, and comparable?
  • What red flags should I watch for in contracts?
  • What payment schedule protects me?

What you'll receive

  • Builder qualification scorecard
  • Bid comparison matrix
  • Red flag identification report
  • Contract review checklist
  • Builder reference verification

Exit Criteria

What must be true before moving to Phase 3:

  • Builder selected
  • Contract terms negotiated
  • Signed with confidence
Phase 3

Design Finalization

1–2 months before construction · 2–3 weeks

What you're deciding

Your pool design needs to work for how you'll actually use it — not just look good on paper. We review your plans against the 12 most common design mistakes and ensure your equipment specs are right.

  • Is this design going to work for how we'll actually use the pool?
  • Are there common design mistakes we're making?
  • Is the equipment specification appropriate and future-proof?
  • Are the materials right for our climate and budget?

What you'll receive

  • Design review (12 common mistakes checklist)
  • Equipment specification review
  • Hydraulic adequacy assessment
  • Material selection guidance
  • Written design review report

Exit Criteria

What must be true before moving to Phase 4:

  • Design finalized
  • Equipment specified
  • Construction-ready plans approved
Phase 4

Construction Oversight

During active construction · 8–24 weeks

What you're deciding

Construction is where things go wrong — change orders, delays, quality issues, and communication breakdowns. You need to know whether to approve milestone payments, challenge change orders, and when to escalate.

  • Should I approve this milestone payment?
  • This change order just came in — is it legitimate?
  • Something doesn't look right — should I be worried?
  • The builder isn't communicating — is this normal?
  • How do I escalate issues effectively?

What you'll receive

  • 10-milestone construction checklist
  • Progress review notes
  • Change order analysis
  • Payment milestone verification
  • Written status reports

10 construction milestones we track

1.Excavation
2.Steel / Rebar
3.Plumbing
4.Electrical
5.Shell (Gunite/Shotcrete)
6.Tile & Coping
7.Decking
8.Equipment Installation
9.Interior Finish
10.Startup & Fill

Exit Criteria

What must be true before moving to Phase 5:

  • Pool shell complete
  • Equipment installed
  • Interior finish applied
  • Startup scheduled
Phase 5

Completion & Handoff

Final weeks through first 30–90 days · 2–4 weeks

What you're deciding

The finish line is in sight, but there are still critical decisions around final payment, punch list items, warranty activation, and learning to operate your pool confidently.

  • Is everything actually done correctly before I make final payment?
  • How do I operate all this equipment?
  • How do I maintain the water chemistry?
  • What warranties do I have and how do I activate them?
  • What's my ongoing maintenance schedule and cost?

What you'll receive

  • Final walkthrough checklist
  • Equipment orientation session
  • Personalized operations manual
  • Water chemistry training
  • Warranty activation checklist

Exit Criteria

What must be true to close out the project:

  • Confident pool operation
  • All warranties documented
  • Project file complete

You choose how much support you need

Every tier covers the same five phases. The difference is how much hands-on advisory you get along the way.

Navigator

$997

Structured guidance, powered by technology

Learn more →

Advocate

$2,497

Your dedicated advisor through every decision

Learn more →

Principal

$4,997

Full advocacy from first conversation to first swim

Learn more →
Free Download

25 Questions to Ask Before Signing a Pool Contract

The checklist our advisors use to protect homeowners from the most common contract pitfalls. Yours free.

Ready to start your journey?

Book a free 15-minute discovery call. We'll discuss your project, your timeline, and which service tier makes sense for you.

Book Your Free Discovery Call